Post Remediation Verification

Key Takeaways

  • Post Remediation Verification (PRV) is AirWell’s independent two-phase protocol that confirms mold remediation was completed correctly and the building meets clearance standards.
  • 1st Phase PRV occurs 1-4 days post-remediation using visual inspection and moisture verification; 2nd Phase PRV occurs 6+ weeks later using HERTSMI-2 dust sampling.
  • Building Clearance requires all five HERTSMI-2 species scoring below defined thresholds, with a composite score at or below 10 indicating acceptable conditions.
  • The 6-week minimum waiting period between Small Particle Cleanup (SPC) and 2nd Phase sampling is non-negotiable — it ensures results reflect true building ecology, not post-cleaning disruption.

Overview

What Is Post Remediation Verification?

Post Remediation Verification (PRV) is an independent assessment conducted by a qualified Indoor Environmental Professional (IEP) to confirm that mold remediation activities were completed in accordance with the Statement of Work (SOW) and that defined clearance criteria have been met. AirWell’s PRV protocol is conducted in two distinct phases that address fundamentally different questions at different points in the remediation timeline.

The 1st Phase PRV — conducted 1–4 days after remediation is complete — confirms that the remediation contractor fulfilled their contractual scope of work and that active fungal amplification has been eliminated within the remediated area. The 2nd Phase PRV — conducted 6 or more weeks after remediation — evaluates whole-building ecological stability using MSqPCR dust analysis and HERTSMI-2 scoring to determine whether the building has returned to background fungal levels. These phases answer different questions and are not interchangeable.

Process Overview

AirWell Two-Phase PRV Timeline

The following diagram illustrates the sequential phases of AirWell’s PRV protocol from the completion of remediation through Building Clearance.

Glossary

Key Terms and Definitions

The following terms are used throughout AirWell’s Post Remediation Verification protocol and documentation. Select any term to expand its definition. Terms are listed in alphabetical order.

Clearance Levels

Remediation Clearance vs. Building Clearance

These are two distinct levels of clearance that address different scopes, timelines, and questions. Using these terms interchangeably creates inaccurate client expectations and undermines the integrity of the assessment.

Remediation Clearance

Scope: SOW Area Only · Phase 1

Issued when the 1st Phase PRV confirms that the work defined in the Statement of Work has been completed to standard.

Applies exclusively to areas and activities covered under the SOW.
Does not assess building areas or contamination sources outside the SOW scope.
Confirms contractual obligation fulfillment — not whole-building health.
Issued at the conclusion of a successful 1st Phase PRV, 1–4 days post-remediation.

Building Clearance

Scope: Whole Building · Phase 2

A broader determination that the building as a whole has returned to background-equivalent fungal levels following all remediation and cleaning activities.

Conducted 6 or more weeks after the 1st Phase PRV is completed.
Does not assess the remediation contractor’s performance.
Determines whether all remediation and environmental improvements have restored the building to background fungal levels.
Identifies contamination sources not included in the original SOW.
Issued at the conclusion of a successful 2nd Phase PRV.

Critical Distinction

A building can receive Remediation Clearance and still contain unaddressed mold sources outside the SOW scope. Building Clearance — via the 2nd Phase PRV — is the only assessment that answers: Has the building as a whole been restored to a healthy indoor environment?

The AirWell Protocol

AirWell’s Two-Phase PRV Process

Each phase addresses a different question at a different point in the remediation timeline. The phases are not interchangeable and cannot substitute for one another.

1

1st Phase PRV — Remediation Clearance

Performed 1–4 days after remediation, while containment is still in place

Timing: 1–4 days post-remediation
Containment: Intact — not yet removed
Outcome: Remediation Clearance

The 1st Phase PRV confirms that active fungal amplification has been eliminated within the remediated area and that the contractor’s scope of work has been fulfilled. The containment must remain in place at the time of assessment to accurately evaluate conditions within the remediated zone without influence from adjacent uncontrolled areas.

What This Phase Includes
  • Visual inspection of all remediated areas by a certified Indoor Environmental Professional (IEP)
  • Spore trap air samples inside the containment — sampling volumes of 75 to 150 liters depending on indoor environmental conditions
  • One or more outdoor background reference samples collected concurrently
  • One or more dust history samples collected by Swiffer-type cloth wipe from horizontal surfaces, analyzed by microscopy

Clearance Indicators — 1st Phase PRV

  • ✓No visible fungal growth or dust debris remaining within the containment
  • ✓Indoor spore types and concentrations reasonably comparable to outdoor background levels and consistent with AirWell’s normal fungal ecology reference database
  • ✓No evidence of active fungal amplification within the containment area
  • ✓Dust history sample result of less than 1% surface area observed to have mold contamination

Successful completion results in Remediation Clearance for the areas and activities defined in the Statement of Work (SOW).

2

2nd Phase PRV — Building Clearance Strongly Recommended

Performed 6 or more weeks after completion of all remediation activities and SPC

Timing: 6+ weeks post-remediation
Scope: Whole building
Outcome: Building Clearance

The 2nd Phase PRV evaluates whether the building as a whole has returned to a stable, background-equivalent fungal ecology. MSqPCR dust samples collected after sufficient dust re-accumulation provide a reliable snapshot of the building’s ongoing fungal burden, independent of remediation disturbance effects.

This phase is strongly recommended by AirWell and is required by CIRS physicians for determining whether a building is safe for patients with Environmentally Acquired Illness (EAI) or Chronic Inflammatory Response Syndrome (CIRS).

What This Phase Includes
  • Three or more MSqPCR dust samples collected from inside the building
  • One outdoor MSqPCR reference sample collected concurrently for comparison
  • HERTSMI-2 composite scoring of all five water-damage indicator species
  • AirWell proprietary species-level interpretation to identify clinically significant species concentrations independent of composite score
  • Assessment for remaining or previously unidentified contamination sources not addressed by the original SOW

Successful completion results in Building Clearance — confirmation that the building has returned to background fungal levels and that no additional active contamination sources have been identified.

2nd Phase PRV Interpretation

HERTSMI-2 Scoring and Species Interpretation

HERTSMI-2 (Health Effects Roster of Type-Specific Formants for Mycotoxins and Inflammagens, 2nd version) is the primary scoring tool used in AirWell’s 2nd Phase PRV. It is derived from MSqPCR dust analysis and quantifies five water-damage indicator mold species that are commonly associated with Environmentally Acquired Illness and Chronic Inflammatory Response Syndrome (CIRS).

HERTSMI-2 Panel Species

The HERTSMI-2 score is calculated from quantitative results for the following five species:

  • Aspergillus penicillioides
  • Aspergillus versicolor
  • Chaetomium globosum
  • Stachybotrys chartarum
  • Wallemia sebi

HERTSMI-2 Score Interpretation

The following scoring guidance reflects the thresholds used by CIRS practitioners when evaluating building suitability for sensitive patients. AirWell uses these thresholds as a starting point and supplements composite scoring with proprietary species-level analysis.

HERTSMI-2 Score Interpretation Clinical Context
≤ 10 Low Risk Generally consistent with a healthy indoor environment for most individuals, including those with environmental sensitivities
11 – 15 Borderline Intermediate range; clinical context, patient history, and species-level data are required before a Building Clearance determination can be made
≥ 16 Elevated Concern Generally considered problematic for sensitive individuals; additional investigation or remediation may be warranted before Building Clearance can be issued
AirWell Species-Level Interpretation

A HERTSMI-2 composite score alone is not sufficient for AirWell’s Building Clearance determination. Specific water-damage indicator species may be present at clinically significant concentrations even when the composite score falls within an acceptable range. AirWell applies proprietary species-level algorithms to evaluate the relative abundance and ecological context of each detected species independently, providing a more complete picture of building health than composite scoring alone.

Sampling Methodology

Why MSqPCR Timing Is Non-Negotiable

MSqPCR dust analysis is the most diagnostically powerful tool available for long-term building fungal ecology assessment — but only when performed under the correct conditions. Premature sampling produces data that is statistically valid but contextually meaningless, and in some cases actively misleading.

MSqPCR reports results as spore equivalents (se) per milligram of dust — a concentration measurement, not a total burden measurement. This distinction is critical: the test measures how concentrated mold DNA is within the dust collected, not how much contaminated dust was present in the building before or after remediation. If remediation removes 99% of contaminated dust, the remaining 1% may carry an identical species concentration profile as before, producing an MSqPCR result that appears unchanged despite highly successful remediation.

Why Early Testing Misleads

Immediately after remediation, insufficient dust has re-accumulated for a representative sample, and residual disturbed particles skew results. A passing result obtained too early may create false confidence; an elevated result may falsely suggest remediation failure. Neither outcome accurately reflects building conditions.

AirWell PRV Sampling Timeline Reference
PRV Phase Primary Sampling Method Minimum Wait Period Recommended Timing
1st Phase PRV Spore Trap Air Samples (75–150 L) + Dust History (Swiffer wipe) 1–4 days post-remediation Before containment removal
2nd Phase PRV MSqPCR Dust Samples — HERTSMI-2 + Species Algorithms 7 days (absolute minimum) 6 or more weeks post-remediation

Professional Standards

Industry Standards and Frameworks

AirWell’s PRV protocols are developed in alignment with established professional standards governing mold remediation and indoor environmental assessment. The following frameworks inform AirWell’s assessment methodology, documentation practices, and clearance criteria.

ANSI/IICRC S520
Standard for Professional Mold Remediation — the primary industry standard governing mold remediation scope, documentation, and clearance protocols.

AIHA
American Industrial Hygiene Association — guidelines for industrial hygiene practice and environmental assessment methodology.

ACAC
American Council for Accredited Certification — certification standards for Indoor Environmental Professionals (IEPs) and Certified Mold Inspectors (CMIs).

NORMI
National Organization of Remediators and Mold Inspectors — professional protocols for mold inspection, remediation oversight, and post-remediation verification.

Scope and Limitations

Assessment Limitations Statement

Environmental testing conducted as part of Post Remediation Verification evaluates building conditions at the time of sampling. The following limitations apply to all AirWell PRV assessments and should be understood by clients prior to commissioning services.

Standard Assessment Limitations

Post Remediation Verification confirms the fungal and particulate status of the building at the specific time of assessment. Environmental testing cannot guarantee that future microbial growth will not occur if underlying moisture conditions change, new water intrusion events occur, or building envelope failures develop after the assessment date. AirWell’s PRV findings are based on field observations, sampling data, and laboratory analysis conducted under conditions present at the time of inspection. These findings are intended to inform — not substitute for — clinical evaluation by a qualified healthcare provider. Building clearance determinations do not constitute medical advice and should be interpreted in the context of a patient’s clinical history and the recommendations of their treating physician.